Orton-Gillingham · Science of reading

Private Reading & Online Tutoring

Orton Gillingham Structured Literacy Methodologies Pre K – Adult

Teacher guiding elementary students through an interactive reading lesson using a laptop to build literacy and reading skills.
0
Programs Offered
0 yrs
Avg. Reading Growth
0
Reading Levels Gained

1992

Teaching Since

Orton Gillingham

Orton Gillingham Structured Literacy Online Tutoring

We believe, passionately, that all children and adults can be taught to read and comprehend. We identify the strengths and weaknesses affecting reading comprehension, fluency, phonemic awareness, phonics, vocabulary, writing, and math with instruction based on each individual's learning needs.

Graduation cap icon representing student achievement, academic success, and reading education.

Structured Literacy

The fundamental approach for multi-sensory, phonics-based instruction for dyslexia — suitable from Pre-K through Adult.

Open book icon representing reading lessons, literacy resources, and educational learning materials.

Reading System

Designed for students in grades 2-12 and adults with significant gaps in decoding/spelling.

Reading assessment icon with a check mark representing student progress and learning success.

Vocabulary Mastery

A highly accelerated program for older students needing efficient word study skills.

Person with sound waves icon representing one-on-one reading support, personalized tutoring, and interactive learning.

Speech to Print

Develops the sensory-cognitive processing needed for reading, spelling, and speech.

Eye icon representing reading observation, student progress monitoring, and literacy assessment.

Visual Imagery

Develops symbol imagery for phonological awareness, orthographic mapping, and fluency.

Digital learning icon representing online reading lessons, interactive literacy instruction, and educational resources.

Spelling System

An OG-influenced system specifically designed for children and adults with dyslexia.

Who We Help

"My child is bright, but reading feels like an impossible mountain to climb. We needed someone who truly understood how their brain works."

— Parent of a 3rd Grade Student

Candidates for Our Program

  • Students diagnosed with Dyslexia, Dysgraphia, or ADHD.

  • Children struggling with phonological awareness or decoding.

  • Bright students who are underperforming in reading & spelling.

  • Adults looking to improve their literacy skills.

Orton Gillingham or Structured Literacy Tutoring with Progress Monitioring

Who Benefits from Our Phonics Decoding Program

Our program is designed for students with language-based learning disabilities, such as dyslexia, or those struggling with word-level decoding and spelling.

Signs your child may benefit:

Struggles to decode words accurately (bottom 30th percentile).

Reads slowly and without fluency.

Knows sight words but struggles with unfamiliar or made-up words.

Frequently guesses instead of decoding.

Poor spelling (bottom 30th percentile).

Speaks and understands English but struggles to read/write it (e.g., English language learners).

Has a diagnosed language-based learning disability.

Our Approach

Students who struggle with reading and writing need direct, explicit instruction. We use research-proven methods tailored to each student's needs, with continual progress monitoring and encouragement helping improve both grades and confidence.

Our tutors are among the best in the nation, holding certifications including Orton-Gillingham (AOGPE), Center for Effective Reading Instruction, Wilson Reading Dyslexia Specialist, and Barton Reading and Spelling.

Characteristics of Lessons Under Orton Gillingham Approach

Orton Gillingham is a reading approach which tends to create individual-based interventions for every kid. Any best Orton Gillingham tutor will, first of all, try to understand what difficulty the child is facing and then devise the lesson plans to address such difficulties. The characteristics which are the foundations of the Orton Gillingham reading approach and followed by every Orton Gillingham certified tutors are the following:

01

Lessons are highly

personalized

As mentioned earlier, the Orton Gillingham approach is based on a very much individualized intervention. This means that based on every kid’s needs and requirements; the lessons are personalized which is a very important foundation of this reading approach.

02

Lessons make use of more than one sense

Instead of just using one sense, the lessons under this approach make use of the tactile-kinesthetic, visual as well as auditory modalities to help children. This is because it is believed that by making the use of more senses; the children are kept engaged in the lessons and can retain and understand the information in a better way.

03

Lessons are extremely comprehensive while being sequential

Our Orton-Gillingham trained tutors design well-structured lessons that make language learning easier for each child. Instruction follows a logical sequence — starting with letter sounds, then progressing to syllables, words, and sentences based on the child's ability.

04

Lessons are diagnostic

After every lesson under the Orton Gillingham approach, the student’s ability and performance are thoroughly monitored. Based on this evaluation, future lessons are devised by the Orton Gillingham certified tutors to further enhance the student’s strength and to tackle his/her weaknesses, if any.

05

Why choose us for Orton Gillingham reading tutoring?

iReading provides opportunities to kids as well as adults who wish to get acquainted with the Orton Gillingham reading approach online. We have highly professional and best Orton Gillingham tutor who will make your whole learning experience one of a kind. Contact us to know more.

Our Simple 4-Step Process

Number 1 icon representing the fourth step in the iReading Tutor learning process.

Highly Personalized

Lessons tailored to the specific cognitive profile of each student.

Number 2 icon representing the fourth step in the iReading Tutor learning process.

Multi-Sensory

Simultaneous use of visual, auditory, and kinesthetic pathways.

Number 3 icon representing the fourth step in the iReading Tutor learning process.

Sequential

Skills are taught in a logical progression from simple to complex.

Number 4 icon representing the fourth step in the iReading Tutor learning process.

Diagnostic

Continuous assessment ensures mastery before moving forward.

Scarborough Reading Rope

Students with Dyslexia typically have deficits associated with the bottom section of the rope at the

WORD LEVEL- Phonemic Awareness, Decoding, Spelling, Sight Word Recognition

Students with Autism typically have deficits associated with the top section of the rope.

LANGUAGE COMPREHENSION- background knowledge, vocabulary, semantics/syntax, verbal reasoning, and literacy knowledge.

Simple View of Reading diagram showing that reading comprehension is the product of word recognition and oral language comprehension, with vocabulary supporting comprehension.
Scarborough Reading Rope diagram illustrating how language comprehension and word recognition combine to develop skilled reading through increasingly strategic and automatic processes.

Why Choose iReading Tutor?

Certified Tutors

Experts in Orton-Gillingham and Wilson methods.

Custom Plans

No two students are the same. Neither are our plans.

Flexible

In-home or online to fit your family's busy schedule.

Affordable

High-quality therapy at competitive rates.

Proven

Success stories from hundreds of local families.

iReading Tutor contact information displayed beside a photo of a tutor conducting a one-on-one reading assessment with a student.

Data from a 2nd grader with Autism, increased 6 Reading Levels H- M in just 12 sessions!

In just 12 sessions, our tailored approach helped a 2nd grader with Autism jump 6 full reading levels from H to M. Real results, backed by structured, multi-sensory instruction. This is the kind of progress every child deserves.

Proud Member and Accredited by

The Reading League logo featuring the organization name surrounded by a circular design of blue dots.
International Dyslexia Association (IDA) logo representing the organization dedicated to dyslexia awareness, research, and evidence-based literacy education.
This badge features the Better Business Bureau (BBB) logo alongside the text "BBB Accredited Business" on the left. On the right, it prominently displays an "A+" with the word "rating", indicating the business has received an A+ rating from the Better Business Bureau.

Best Private Tutoring in Orton Gillingham – Boost Your Child's Reading Skills with iReading

Searching for the best private tutoring in Orton Gillingham? At iReading, we provide personalized, effective tutoring based on the Orton-Gillingham approach. Our expert Orton Gillingham tutors help students develop reading fluency, comprehension, and confidence.

Why Choose Private Tutoring in Orton Gillingham?

The Orton-Gillingham method is a proven, structured, and multisensory approach designed to help individuals with dyslexia and other reading difficulties. Choosing private tutoring in Orton Gillingham ensures your child receives tailored lessons that fit their unique learning style.

Benefits of Orton Gillingham Private Tutoring:

  • Personalized lesson plans based on individual needs

  • One-on-one support for better comprehension

  • Multi-sensory learning techniques to enhance engagement

  • Builds confidence and reduces frustration in reading

  • Suitable for students with dyslexia and other learning challenges

iReading: The Top Choice for Private Tutoring in Orton Gillingham

At iReading, we take pride in offering private tutoring Orton Gillingham that is tailored to meet the specific needs of each student. Our experienced tutors use research-backed methods to enhance phonemic awareness, decoding skills, and overall literacy.

What Sets iReading Apart?

  • Certified Orton Gillingham tutors with years of experience

  • Customized lesson plans for individual progress

  • Flexible scheduling – online and in-person options

  • Affordable pricing for quality education

  • Proven success in improving reading skills

Online Private Tutoring – Learn from Anywhere!

For families seeking flexibility, we offer tutor Orton Gillingham online services. Our virtual tutoring provides the same level of personalized support as in-person sessions. With interactive tools and structured lessons, students can improve their reading skills from the comfort of home.

Advantages of Online Orton Gillingham Tutoring:

  • Convenient learning from home

  • Engaging digital resources and tools

  • One-on-one sessions tailored to student needs

  • Regular progress tracking and feedback

Who Can Benefit from Orton Gillingham Private Tutoring?

Our private tutoring in Orton Gillingham is designed for:

  • Students with dyslexia struggling with reading

  • Children who need extra support in phonics and comprehension

  • Students who find traditional reading programs ineffective

  • Parents looking for an individualized approach to literacy improvement

Join iReading for the Best Private Tutoring in Orton Gillingham

At iReading, we are committed to helping students succeed in reading. With our structured approach and experienced tutors, we ensure every child gains the confidence they need to excel.

Let iReading help your child develop strong reading skills with our expert Orton Gillingham tutors. Sign up for a session today!

Reading assessment progress report table showing student grade levels, reading scores, proficiency levels, and growth gains across multiple assessments.

Our Reading Instruction

Through evidence-based Orton-Gillingham instruction and methodologies, students in a self-contained classroom for students with Autism made measurable progress in their reading skills.

The data shows one student progressing from a 3.9 grade level to a 6.1 grade level and another from a 4.0 grade level to a 6.5 grade level while working within the Florida Access Points curriculum.

(FL Special Ed. diploma option - Access Points curriculum)

These two students made significant improvements in reading through structured, systematic, and multisensory instruction using Orton-Gillingham methodologies. Their progress was so substantial that they were eventually placed in general education classrooms with their typical peers.

Executive Functioning, Organizational, Study Skills Coaching and Instruction

Executive Functioning, Organizational and Study Skills Coaching and Instruction

Keeping track of assignments, maintaining an organized notebook and backpack, and setting up a functional workspace can be a challenge for students and parents alike. We can help in setting up organizational systems for home and school that will help with academic success.

  • Assistance monitoring school assignments

  • Assistance communicating with school staff

  • Prioritizing assignment completion

  • Assistance with developing a monthly, weekly and daily plan to accomplish academic goals

Banner featuring a smiling child with text asking if your child qualifies for a scholarship, including information for low-income and special needs students.

Professional Collaboration

Assistance communicating with various professionals, Speech Language Pathologists, Occupational Therapists, Behavioral Therapists, etc.

Online Reading Tutoring Saves Time

Tutoring in the comfort of your home and on your schedule.

© 2026 iReading TUTOR. All rights reserved. Specialized Literacy Support. Powered by Fluxigo.